General MXK/FiberLAN/ZMS

Home » Events » General MXK/FiberLAN/ZMS
Loading Events
This event has passed.

Prerequisite:

Basic understanding of Ethernet layer 2 bridging and packet forwarding principles, understanding of Voice and Video IP services

Students must bring a laptop computer or tablet with the interface to a 10/100/1000 LAN network and a serial interface.  Software applications should include serial, telnet and/or SSH capabilities along with the ability to view PowerPoint, Word, Excel and .pdf documents.  Java 7 or higher should also be loaded onto the laptop or tablet

Description:

The DZS MXK is a high-density multi-access line concentrator developed to support both fiber and copper interfaces in the same chassis to deliver any service to subscribers in a residential network.  FiberLAN, specifically GPON, is a high-density cost effective fiber alternative to a copper infrastructure for delivering broadband services in commercial and industrial business complexes including hotels, apartment complexes, malls, campus networks, etc.

ZMS management is a Graphic User Interface (GUI) that provides two interfaces.  The first interface is a java-based suite of client/server applications designed to provide flexible network management of the DZS family of networking products.  The second interface is a browser-based application that provides the same functionality as the java-based applications

Through a series of lectures and hands-on exercises, students will be able to configure, provision, administer, manage and troubleshoot the DZS family of networking products using multiple interfaces.

  • $2400 per student.  Duration:  5 Days
  • $14K Custom onsite class (Customer provides facilities and equipment)*
  • $16K Custom onsite class (DZS provides facilities and equipment)*

Pre-purchase for 2 students with hard copy PO issued 45 days prior to class (15% discount)

If you need to cancel and you have been previously confirmed by providing a hard copy PO, the following cancellation fees apply:

  • Cancellation occurs 60 to 45 days prior to the first day of class – hard copy PO will be billed for 25% of the cost of the class
  • Cancellation occurs 44 days to the first day of class – hard copy PO will be billed for 50% of the cost  of the class

 

Advanced Registration

45-day advance registration and a hard copy PO are required to guarantee seats and class availability.

If a PO is issued less than 45 days prior to the start date of the class, no discount is offered.

DZS requires a minimum of three (3) students to conduct a course in Oakland, CA and a minimum of five (5) students to conduct a course in Olathe, KS or Seminole, FL.

Late Registration

If a PO is issued less than 45 days prior to the start date of the class, no discount is offered.

DZS requires a minimum of three (3) students to conduct a course in Oakland, CA and a minimum of five (5) students to conduct a course in Seminole, FL.

  • Student minimum/maximum for customer on-site courses are negotiated.
  • For customer on-site courses, DZS and Customer must mutually agree in advance to a training schedule and content to be delivered

TRAINING AGENDA

Module 1 (Day 1)

  • DZS Product Family Overview
  • DZS MXK GPON Overview
  • MXK/FiberLAN Supported Services

Module 2 (Days 2 thru 5)

  • MXK Installation & Commissioning
  • Lab Breakout Sessions
  • Service Provisioning via CLI
  • Diagnostics and Monitoring via CLI
  • Operational Procedures via CLI
  • Lab Breakout Sessions
  • Service Provisioning via Auto-Assignment and Auto-Configuration
  • Lab Breakout Sessions
  • Service Provisioning via ZMS NetHorizon
  • Diagnostics and Monitoring via ZMS NetHorizon
  • Operational Procedures via ZMS NetHorizon
  • Lab Breakout Sessions
  • Service Provisioning via ZMS Web Client
  • Diagnostics and Monitoring via ZMS Web Client
  • Operational Procedures via ZMS Web Client
  • Lab Breakout Sessions
  • Product Overview (ADSL2+/SHDSL/VDSL2, POTS, PWE) – As Required
  • Service Provisioning of Copper Services – As Required
  • Diagnostics and Monitoring of Copper Services – As Required
  • Lab Breakout Sessions – As Required

Leave A Comment

About DZS

Solution Updates

Bitnami